Amonstar GLUE BINDING MACHINE Manuel d'utilisateur Page 11

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 20
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 10
1. Press the handle and draw out the
paper pressurer.
Operation manual (hard cover)
Before operation:
Prepare the hard cover
Replace the paper pressurer complied for hard cover and allocation shaft.
Allocate the operation handle to “
N
” position
2. Put the hard cover in-between the
platform and paper pressurer. Adjust
allocation shaft to press the hard cover
against the front bafe tightly
3. Put two pieces of self-adhibit mount
separately on two sides of the files, tidy
them neatly, and then put them inside
the hard cover. Keep them close to the
allocation shaft, then push the handle
10
Vue de la page 10
1 2 ... 6 7 8 9 10 11 12 13 14 15 16 ... 19 20

Commentaires sur ces manuels

Pas de commentaire